Scheduling and Monitoring of Arch Bridge Projects using Primavera P6: Best Practices and Case Studies

Deepak Kumar kushwaha, Harsh Rathore

Abstract


The essential objective behind the examination is to recognize the work job of observing and controlling the task progress of development and get plan of action distribution utilizing the executives instruments, for example, primavera P6. This was achieved through reconsidering the writing and systems utilized in checking and control. The review filled in as a guide for dissecting development progress and recognizing explicit issues that emerged during the cycle. The discoveries of the review uncovered the deficiencies of the ongoing venture the executives framework in project execution. Another task the board plan is finished that is both productive and savvy. By assigning more assets to project exercises, the time cost exchange of the task term can be brought down. In any case, doing so raises the venture's expense. For booking a bunch of undertaking errands, the basic course technique is utilized. Primavera programming was additionally utilized for asset examination.

This exploration presents the preparation and planning of a task arranged in Bhopal, Madhya Pradesh. The designation of assets is finished utilizing Primavera P6 to screen the functioning method of the undertaking in each stage.


Full Text:

PDF

References


KeshavPhophalia and RiddhaBasu, [EVALUATION OF MICROSOFT PROJECT AND PRIMAVERA P6 AS CONSTRUCTION PROJECT MANAGEMENT SOFTWARE IN INDIA], INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] ISSN: 2394-3696 VOLUME 5, ISSUE 3, Mar.-2018.

AnuragMahure and Amit kumarRanit, [Construction Project Analysis Using Primavera P6], JASC: Journal of Applied Science and Computations, Volume 5, Issue 8, August /2018, ISSN NO: 1076-5131.

YashPandit, Swaroop Kulkarni, YashChoulwar, SoumitraKher and S.D.Marawar, [Analysis of Planning and Scheduling Using Traditional and Primavera Approach], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 6, Issue 4, April 2017.

T.Subramani and K.Chinnadurai, [Construction Management And Scheduling Of Residential Building Using Primavera], International Journal of Application or Innovation in Engineering & Management (IJAIEM), Volume 4, Issue 5, May 2015, ISSN 2319 - 4847.

Md. ZishanMallick and MohdZeeshan khan, [CONSTRUCTION PLANNING AND CONTROL USING PRIMAVERA P6], IJARIIE-ISSN(O)-2395-4396, Vol-5 Issue-4 2019.

Sudarshan. S and Geena George, [COMPARISON OF PROJECT PLANNING & SCHEDULING SOFTWARE PRIMAVERA AND MICROSOFT PROJECT USED IN THE CONSTRUCTION INDUSTRY], International Journal of Engineering Technologies and Management Research Septmber 2021 8(9), 78-87.

K.Priya, M.Kathiresan, D.Vengateshwari and M.Suriyakumari, [PLANNING, ANALYSIS AND CONSTRUCTION SCHEDULING OF APPARTMENT BUILDING (G+13) BY USING PRIMAVERA P6], International Journal of Scientific Development and Research (IJSDR), March 2019 IJSDR | Volume 4, Issue 3, ISSN: 2455-2631.

Suchithra L and Anne Ligoria S, [TRACKING AND MANAGEMENT OF CONSTRUCTION PROJECTS USING PRIMAVERA], International Research Journal of Engineering and Technology (IRJET), Volume: 04 Issue: 07 | July -2017.

NidhiRaghuwanshi and M. C. Paliwal, [Planning and Scheduling Construction Projects using Primavera Software: A Case Study], International Journal of Trend in Scientific Research and Development (IJTSRD) Volume 5 Issue 2, January-February 2021.

FathimaZerin T and Angela C. Joy, [Construction Management Using Primavera], International Journal of Science and Research (IJSR) ISSN: 2319-7064, 2018.


Refbacks

  • There are currently no refbacks.