

Difficulties with Digitalization Integration in Fit-Out Projects
Abstract
Through the use of information technology, the design and construction industry is currently moving away from a traditional manner and toward a more dependable and efficient one. It has not yet attained its full potential, though, and is still in its infancy in developing countries like India. This paper aims to identify the various challenges associated with Office Fit-Out Construction, a type of Fast track construction approach, and then connect it with various digital technologies that could be used to mitigate these challenges. The ultimate goal is to improve smooth management for both the client and the executing firm. Based on the literature review and expert interviews, a number of challenges have been identified; a range of case studies validate the validity and regularity of these challenges. Numerous causes of these issues have been identified and summarized using fishbone diagrams. They looked at further ways that technology and different digital products that are on the market could help to lessen these reasons. The results were then scrutinized to ascertain their consequences for the construction site and to suggest appropriate measures for enhancing the administration of office fit-out projects via digitization.
References
Singh, V. P. (2022). Feasibility Study of Adaptive Reuse of Old Buildings. . International Journal of Housing and Human Settlement Planning,, 10-31.
SK Solanki, R. R. (n.d.). Cost Analysis of Functional Retrofitting Measures in Buildings . Journal of TheInstitution of Engineers (India), 725-732.
Solanki, S. K., & Paul, V. (2022). Comparison between service life prediction methods for building rehabilitation: application on a case study;. Journal of Building Pathology and Rehabilitation.
Stovall Construction. (2020, January 23). Retrieved from Stovall Constructioninc: https://www.stovallconstructioninc.co m/news/fit-out-construction/
Sultan, M. (2015). Identification and Prioritization of Csfs and Perception of
a. the Stake Holders for Fast Track Construction Projects in Pakistan. IISN.
Temitope Egbelakin, O. E. (2021). Managing Fast-Track Construction Project in Qatar: Challenges and Opportunities. MDPI.
The Fit-Out Construction Process and Different Types of Fit-Outs. (2020, January 23). Retrieved from Stovallconstructioninc: https://www.stovallconstructioninc.co m/news/fit-out-construction/
(2016). Think Act - Digitilization in the construction industry. Munich, Germany : ROLAND BERGER GMBH.
Yelda Turkan, F. B. (2011). Automated progress tracking using 4D schedule and 3D sensing technologies. Elseier, 414-421.
Zhou, K. L. (2015). Industry 4.0: towards future industrial opportunities and challenges. 12th International Conference on Fuzzy Systems and Knowledge Discovery.
Refbacks
- There are currently no refbacks.