Open Access Open Access  Restricted Access Subscription Access

Applicability of Risk Assessment Tools and Techniques for a Construction Project

Souvik Das, Abhijit Rastogi, Kuldeep Kumar

Abstract


The construction projects are prone to several risk variables that will affect their key features such as precise goals, time limits, financial restrictions, special organizational and legal requirements, etc. However, there are varying severity of effects due to the different risk factors on these projects' key features and if these risk factors are not taken into consideration or overlooked during various project phases, then the construction project is probable to exhibit the issues of time and cost overruns. This main paper aims to identify risk management tools, techniques, and their applicability on a construction project. Risk factors are identified through literature and case studies. Simultaneously critical activities are identified and the impact of risk factors on those critical activities are loaded. After identification, stage qualitative and quantitative analysis of risk factors and simulation is performed to compare the scheduled duration, deterministic duration, and actual duration. This analysis is required to identify the applicability of the risk management process applied. The findings confirm the existence of gaps in the process of risk management in case study projects. Accordingly, mitigation strategies are proposed to make the current risk management process robust.


Full Text:

PDF

References


Project Management Institute, Ed., The standard for project management and a guide to the project management body of knowledge (PMBOK guide), Seventh Edition. Newtown Square, Pennsylvania: Project Management Institute, Inc, 2021.

Sawhney, A., Agnihotri, R., & Paul, V. K. (2014). Grand challenges for the Indian construction industry. Built Environment Project and Asset Management.

Paul, V. K., & Basu, C. (2018). A Handbook for Construction Project Planning and Scheduling. Copal Publishing Group.

Yadav, P.S., Paul, V.K (2020). Complexities of Cost Overrun in Construction Projects. 5(2):4.

Kukreja, B., Paul, V.K., Bawaniya, V(2020). Analysis of Key Factors Influencing Labour Productivity in Construction Projects.8(7):9.

Mittal, Y. K., Paul, V. K., Rostami, A., Riley, M., & Sawhney, A. (2020). Delay factors in construction of healthcare infrastructure projects: a comparison amongst developing countries. Asian Journal of Civil Engineering, 1-13..

Mittal, Y. K., & Paul, K. (2018). Identification of critical factors for delay in metro rail projects in India. IJSRTM, 6(1), 30-39.

Raz, T., & Hillson, D. (2005). A comparative review of risk management standards. Risk Management, 7(4), 53-66.

Potts, K. E., Rajabifard, A., & Bennett, R. M. (2017). Supporting the risk management process with land information: a case study of Australia. Disasters, 41(2), 352-364.

Konde, V., & Minde, P. (2017). Identification and Assessment of Risks in Construction Projects: A Case of Pune City. p. 4.


Refbacks

  • There are currently no refbacks.