Open Access Open Access  Restricted Access Subscription Access

Analyzing the Impact of Resource Allocation on Project Completion Time in the Construction Industry Using SPSS

Hasara Nethmalee Nandasena, NILESHKUMAR CHIMANBHAI SONARA, J. R. Pitroda

Abstract


In the construction sector, timely project completion depends on effective resource allocation. This study investigates the relationship between resource allocation; including labor, material, and equipment and project completion time using statistical analysis in SPSS. By employing simulated data, the research identifies key factors affecting project timelines and provides insights into optimizing resource management. Results indicate significant correlations between resource allocation efficiency and reduced delays, emphasizing the importance of strategic planning in construction projects.


Full Text:

PDF

References


Haritha, P., & Vidhya, K. (2020). Analysis of rework and rescheduling in construction project using SPSS software. International Journal of Trend in Scientific Research and Development, 4(4), 169–173. Available at: https://www.ijtsrd.com/papers/ijtsrd30930.pdf

Anandhi, B., & Mukilan, K. (2017). International Journal of Scientific Engineering and Research (IJSER). International Journal of Trend in Scientific Research and Development, 5(4), 49–54.

Adepu, N., Kermanshachi, S., Pamidimukkala, A., & Loganathan, K. (2023). Analyzing the factors affecting construction project schedules amidst COVID-19 pandemic. Project Leadership and Society, 4, 100100. https://doi.org/10.1016/j.plas.2023.100100

Subramani, T., & Karthick, T. M. (2018). Study on time and resource management in construction projects using MS Project. International Journal of Engineering and Technology, 7(3), 23–26. https://doi.org/10.14419/ijet.v7i3.10.15622

(n.d.). Using SPSS to evaluate time delay analysis in construction projects. International Journal of Engineering and Technology Science - IJETS, XI(VII), 77–100.

Bankar, S. V. (2023). Using SPSS software to minimize the time and cost of the construction work. International Journal of Research in Applied Science & Engineering Technology, 11(5), 6857–6861. https://doi.org/10.22214/ijraset.2023.53220

Hewavitharana, T., Nanayakkara, S., Perera, A., & Perera, J. (2019). Impact of enterprise resource planning (ERP) systems to the construction industry. International Journal of Research in Electronics and Computer Engineering, 1. https://doi.org/10.6084/m9.figshare.8868392

Of, N., & Under, Y. (2015). Analysis of delay in execution of construction projects. Journal of Civil Engineering Science and Technology, 9(1), 1–6.

Jadhav, D. S. (2018). Delay analysis in construction project using MS Project & SPSS. International Journal of Research in Applied Science & Engineering Technology, 6(3), 2244–2247. https://doi.org/10.22214/ijraset.2018.3355


Refbacks

  • There are currently no refbacks.