Application of Just-in-Time Inventory Management in Construction Projects: A Systematic Review
Abstract
Efficient materials management is one of the key components in achieving efficiency and cost reduction in the construction industry. Many construction companies have traditional inventory management systems whereby materials in excess of what is required are stored. This leads to handling of materials and consequently tremendous amounts of materials wasted once materials have reached the construction site. Just-In-Time (JIT) is an inventory management approach that was first used by Toyota in its Production System and would enable the construction firm to receive materials in the right quantities at the right time. This would reduce the materials in storage and consequently boost efficiency. From conducting a systematic search of literature pertaining to JIT in construction industry inventory management, it was established that there were various research studies that offered insights into JIT and its benefits and challenges in construction industry inventory management. Results indicated that there were various ways in which JIT is effective in reducing material waste and boosting efficiency in construction industry inventory management.
References
P. Yogendra and P. Dhananjay, “Feasibility Study of Just in Time Inventory Management on Construction Project,” Int. J. Sci. Res., vol. 4, pp. 2319–7064, 2015, [Online]. Available: www.ijsr.net
W. S. Jeong, S. Chang, J. W. Son, and J. S. Yi, “BIM-integrated construction operation simulation for just-in-time production management,” Sustain., vol. 8, no. 11, pp. 1–25, 2016, doi: 10.3390/su8111106.
M. Sayed, S. Ali, and S. Ahmed, “Need for JIT implementation: Material shortage problems as a cause of delay in construction projects in Egypt,” Int. J. Civ. Eng. Technol., vol. 8, no. 7, pp. 30–36, 2017.
T. Si, H. X. Li, M. R. Hosseini, Y. Ji, and C. Liu, “A Solution to Just-in-Time Delivery for Off-Site Construction: A Conceptual Model,” Constr. Res. Congr., pp. 345–353, 2020.
T. Si, H. X. Li, Z. Lei, H. Liu, and S. H. Han, “A Dynamic Just-in-Time Component Delivery Framework for Off-Site Construction,” Adv. Civ. Eng., vol. 2021, 2021, doi: 10.1155/2021/9953732.
S. Dharmadhikari and P. V Payghan, “Implementation of Just-In-Time approach in Construction Project (A Review Paper),” Int. J. Res. Appl. Sci. Eng. Technol., vol. 10, no. 11, pp. 1553–1555, 2022, doi: 10.22214/ijraset.2022.47642.
S. A. Hossein, A. Al Tamimi, and G. Kashwani, “Application of JIT on Materials and Labor Management of Construction Site,” Emirati J. Civ. Eng. Appl., vol. 2, no. 1, pp. 50–57, 2024, doi: 10.54878/6q4v5p60.
J. García-Cutrín and C. Rodríguez-García, “Enhancing Corporate Sustainability through Just-In-Time (JIT) Practices: A Meta-Analytic Examination of Financial Performance Outcomes,” Sustain. , vol. 16, no. 10, 2024, doi: 10.3390/su16104025.
A. Bidhendi, R. F. Herrera, and M. Poshdar, “Simulating Jit Implementation in Prefabricated Construction: a Digital Framework for Supply Chain Optimization,” Annu. Conf. Int. Gr. Lean Constr. IGLC, vol. 33, pp. 657–668, 2025, doi: 10.24928/2025/0158.
M. Waheed, M. Abbas, and A. H. Memon, “Just-In-Time Importance in the Construction Industry,” AMPLITUDO J. Sci. Technol. Innov., vol. 4, no. 2, pp. 99–102, 2025, doi: 10.56566/amplitudo.v4i2.318.
Refbacks
- There are currently no refbacks.