Planning for Building Construction: Methods, Techniques, and Modern Approaches – A Review
Abstract
Planning plays a critical role in the successful execution of building construction projects because it provides a systematic approach for organizing project activities, managing resources, and controlling project performance. Effective planning enables project managers to define project objectives, prepare realistic schedules, and coordinate construction operations in an organized manner. Traditional planning techniques such as Work Breakdown Structure (WBS), Gantt charts, Critical Path Method (CPM), and Program Evaluation and Review Technique (PERT) have long been used to improve project scheduling and activity coordination. In recent years, modern technological tools such as Building Information Modeling (BIM), digital project management systems, and automated planning approaches have further enhanced the efficiency and accuracy of construction planning. These technologies support better project visualization, improve communication among stakeholders, and assist in monitoring project progress more effectively. This review paper examines the major methods, techniques, and modern approaches used in planning for building construction projects. The study highlights how proper planning contributes to improved resource utilization, reduced project delays, and better decision-making throughout the construction process. It also discusses key challenges faced in construction planning and emphasizes the importance of integrating traditional planning techniques with modern digital tools to achieve more reliable and efficient building construction projects.
References
Y. Zhang and X. Yang, “CONSTRUCTA: Automating Commercial Construction Schedules with Large Language Models,” arXiv preprint arXiv:2502.12066, 2025.
L. Wang, J. Li, Q. Ye, Y. Li, and A. Feng, “Automatic Planning Method of Construction Schedule under Multi-Dimensional Spatial Resource Constraints,” Buildings, vol. 14, p. 3231, 2024.
A. Sharma and R. Mehta, “Best Practices for Efficient Project Planning and Scheduling in Construction Management,” International Journal of Research Publication and Reviews, vol. 5, no. 7, pp. 212–219, 2024.
C. M. Abdullahi and M. Tembo, “Improving the Efficiency and Effectiveness of Construction Project Planning and Scheduling Using Lean Principles,” International Journal of Construction Engineering and Management, vol. 12, no. 3, pp. 75–80, 2023.
S. Alyatama and R. Al-Sabah, “Construction Planning and Scheduling of a Precast House Extension Using a Multi-Objective Genetic Algorithm and 4D Building Information Modelling,” QScience Connect, vol. 2023, no. 2, pp. 1–14, 2023.
S. A. Khalil, A. Ihsan, I. Khan, and A. Ali, “Role of Project Planning in Success of Construction Projects: Mediated by Top Management Support,” International Review of Basic and Applied Sciences, vol. 11, no. 1, pp. 80–90, 2023.
E. Mengiste, B. García de Soto, and T. Hartmann, “Automating Look-Ahead Planning Using Site Appearance and Space Utilization,” Automation in Construction, vol. 148, pp. 1–15, 2023.
L. Chen and Y. Wang, “Modeling Techniques for Project Planning and Time Optimization in Construction Management,” Construction Innovation Journal, vol. 22, no. 4, pp. 641–655, 2022.
A. A. Desai, “Evaluation of Construction Planning Process,” Journal of Emerging Technologies and Innovative Research, vol. 8, no. 11, pp. 557–563, 2021.
S. K. Abdulkareem, “Methods of Project Planning for Construction Projects,” Engineering Research Journal, vol. 9, no. 2, pp. 45–52, 2020.
Refbacks
- There are currently no refbacks.